Deutz 1012 Especificaciones Pagina 34

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 282
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 33
Page 26
Section 4.1
Service Training
09.06
SETTING OF INJECTORS
For a correction of the opening pressure:
- Remove injector from nozzle tester 8008. Remove
tensioning nut and uninstall all components. Use dolly
110 110 for the injector.
Sequence of parts disassembly and re-assembly
1. Tensioning nut
2. Nozzle
3. Adapter
4. Thrust pin
5. Compression spring
6. Shim
- Adjust opening pressure by selecting appropriate shim.
A thicker shim will increase the opening pressure. Re-
assemble injector. Tighten tensioning nut.
Specified tightening torque: 30 - 40 Nm
- Check injector on nozzle tester 8008 once again.
Vista de pagina 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 281 282

Comentarios a estos manuales

Sin comentarios